top of page
IMG_6309.heic

Walk in Showers

Examples of Our Work

Remodeling: Projects
IMG_6306.jpeg

Why our Showers are different - Before

Its pretty simple actually.. we use the best materials possible to give our customers with a piece of mind for years to come! We ONLY use Kerdi & Schluter products for excellent looking results and for water tight seals which is the distinct orange waterproofing membrane you see featured above. We successfully completed this project on time and within budget, it’s a great example of delivering on our promise of quality work while ensuring absolute client satisfaction. Want to learn more about similar projects? Get in touch today.

IMG_6304_edited.jpg

Finished walk in shower 3 1/2ft x 6ft - After

Here is the finished product. This customer wanted a center drain and a basic subway tile on the walls along with a beautiful white grout! If you’re looking for a certified contractor to manage a really complex job, consider this project a testament to our abilities. We managed to deliver excellent results on schedule and under budget. We worked closely with the client to understand their needs and preferences, and the successful outcome speaks for itself.

IMG_3472.heic

"The Big Ugly Tub" - Before

This was an old big bathtub from the previous home owners. Lets just say its not the most stylish bath tub we have seen before plus there was no way to take a shower. While working on this project, we were very poignant about the materials and footprint of our work. We worked together with the client in order to manage their expectations and deliver the kind of results they desired. At Troy Contracting, our goal is to bring our client’s vision to life while working with them every step of the way.

IMG_6301.jpeg

Finished 4ft x 9ft Custom Walk In Shower - After

This is a large walk in shower that features an added bench, a niche for shampoo & conditioner, a rain shower head mounted to the wall along with a full body spray feature with a wand. We installed a 48" linear drain for maximum drainage performance. This shower has all the bells and whistles along with a heat grid floor underneath their choice of tile.This project involved a lot of compliance measures to make sure we followed industry standards adequately. Successfully completed on time and within budget, it’s a great example of delivering on our promise of quality work while ensuring absolute client satisfaction. Want to learn more about similar projects? Get in touch today.

bottom of page